Loading...
Loading...
Stakeholder talk-track through the Interactive High-Throughput Workcell Planner: scientific intent, deck layout and liquid handling, safety interlocks and I/O, LIMS/ELN payload handoff, and Ladder Logic / Structured Text. Synthetic demo only — not a live PLC, SCADA, LIMS, or liquid-handler connection.
Captions follow on-screen steps. Use Pace for a mild slowdown if you need more reading time. Shareable transcript: transcript.md · narration.vtt
Intent → deck → interlocks → LIMS/ELN payload → Ladder Logic (~12 min)
Sign in to reveal presenter talk-track lines for stakeholder demos.
01Workcell walkthrough opening
Workcell Planner: scientific intent → deck → interlocks → LIMS/ELN payload → Ladder Logic.
02Scientific intent & process type
Pick process type — run ID ties scientific intent to the workcell record.
03Deck layout & liquid handling
Deck layout + liquid-handler instrumentation — geometry before orchestration.
04Safety interlocks & I/O
Interlock profile → door, e-stop, and profile I/O before Run Permit.
05LIMS / ELN payload handoff
JSON/CSV payload to LIMS/ELN / data lake — synthetic handoff, Save to Project.
06Ladder Logic / Structured Text review
Python · C# · Structured Text/Ladder — same config, fail-safe Run Permit.
Translating scientific and manufacturing intent into executable machine control — workcell configuration, hardware interlocks, and multi-layer scripting hooks on one form.
Payloads and scripts are synthetic examples for portfolio demos. They are not validated computer-system documentation and do not interface with production OT or LIMS. Treat interlocks as part of the protocol before first automated run.
View Part 11 audit trail demo